Chapter 55: Start Of The Second Phase Of The Project
Replenishing energy is also a sacrifice to one's internal organs.
After adjusting the state, he danced the Five Animals Play.
This time, he was no longer exhausted after three movements, but performed the whole set, which once again proved the powerful effect of the life potion.
"Too strong!"
Zhang Heng had a more intuitive feeling. After at least dancing the Five Animals Play once, a new sense of power came from his body, which further explained the problem: "If you keep practicing, it is impossible to become a superman, and it is impossible to become a practitioner in myths and legends, but it should be no problem to kill a cow with one punch."
Made a rough assessment!
It is possible to become a martial arts master, but it is impossible to become a practitioner.
He did not have any extravagant hopes in this regard, and it was not a spiritual energy revival. If the spiritual energy was revived, there would still be this possibility.
Rest for a while, dance again, and then end this exercise.
Exercise, occasionally go to the construction site for a walk.
Days passed one by one.
Ten days passed in the blink of an eye.
During these ten days, I have been exercising, dancing the Five Animals Play, and developing my body as much as possible.
Just a moment ago, he danced again.
But now he had to stop.
"Mr. Zhang... This is a detailed design drawing!"
"Okay, Mr. Sun!"
Zhang Heng drove to the temporary station on the construction site and made a little joke: "Mr. Sun doesn't need to come in person, just hand it over to Chief Engineer Zhao."
"Hahaha... Yours is our key project, and you are our big customer. It's not that I don't trust Chief Engineer Zhao. I, the boss, come here in person to show my importance."
Mr. Sun is worthy of being the boss of China Construction Group. He speaks very beautifully: "Most of these design drawings come from the design department of our headquarters, combining appearance with science."
"Well, let me take a look first!"
Zhang Heng nodded and became serious. He believed in other people's design ability, but everyone has different aesthetics. Whether it meets his aesthetics or not needs to be confirmed after reading it.
It's not just the design drawings of a building.
All the drawings, as many as dozens of them.
He kept flipping through them, frowning from time to time, shaking his head from time to time, and nodding with a satisfied smile from time to time.
Visible!
Some of the design drawings did not meet his requirements, but some of them were satisfactory.
"Mr. Sun, and Mr. Zhao, let me take these drawings back, take a good look at them, and then give my opinion."
Zhang Heng also gave this answer after considering it: "Very soon, it won't take long."
"No problem, of course no problem."
Mr. Sun responded with a smile. It is also an inevitable link for customers to make suggestions and make modifications. Even if the whole design is overturned and redesigned, the client is the biggest party and dare not raise any objections: "During this period, we will have a design team stationed here, and we can communicate at any time."
"Okay!"
Zhang Heng didn't say much. He had already made a plan in his mind. If he didn't use an intelligent program, he would be a fool: "In addition... For the second phase of the project, I need to add a little more and build three large docks."
"The location is on the right side of the dock, close to the large warehouse area. At that time, the dock and the warehouse area will be connected."
"The style of the dock is semi-enclosed, with only the entrance and exit retained, and the top and everything are closed. As for the size, each dock needs to be able to berth two large ships of more than 10,000 tons."
Zhang Heng did not forget the suggestion of Smart No. 1, which was also a part of his cover-up: "There is also an additional project. I plan to renovate our old house, which is also the courtyard house. I think you are familiar with it."
"I want to demolish the courtyard house, tear it down and rebuild it, and build a villa, so that it will be more comfortable to live in."
"I don't need you for the design. I will find someone to design it myself, and then hand it over to you for construction. You just need to send an additional construction team for this aspect."
Zhang Heng finally finished what he wanted to say in one breath.
"No problem, quality and quantity are guaranteed."
Mr. Sun was overjoyed and increased the amount of work. For them, there were only benefits and no disadvantages: "For the villa, we will use the most environmentally friendly materials so that you, Mr. Zhang, can move in as soon as possible."
"Okay!"
Zhang Heng smiled and nodded, looking very satisfied: "After I put forward my opinions, do the calculation as soon as possible, and then start construction as soon as possible. Speed wins. The sooner it is built, the faster my industrial plant will run."
There is nothing shameful about making money!
Soon, the mining ship will be able to mine level 3 minerals.
At that time, I am afraid that more space will be needed to provide assistance, such as natural gas storage tanks. Without this thing, even if the natural gas can be mined, there is no place to store it, which will seriously slow down the progress and prevent him from making more money. As for whether Tianqiran is within the scope of the third-level mineral mining, he is not worried at all, it is definitely included. ……